8 December 2021

Digman Reserve play space final concept design

Thank you to everyone who took the time to contribute to the Digman Reserve Play Space consultation over September and October 2021. To view a detailed summary of what we heard during this period please click here or download the report from the document library.

Your feedback has informed the below final concept plan for the Digman Reserve Play Space. Only minor changes were made to the draft concept plan including:

  • reorientation of the basketball ring to face south
  • realignment of main path
  • inclusion of a new play feature – spinning bowl
  • extended areas of rubber mat surfacing to improve accessibility to the community swings and trampoline
  • reduced areas of lawn i.e. substituted with granitic gravel and mulch surfacing

Please let us know if you have any feedback on the final concept plan by completing the below survey or email us any questions and comments at projects@hobsonsbay.vic.gov.au by 5.00pm Wednesday 5 January 2022.

Concept design and features

Click the below concept design and features to view in full page

Have we got this right?

Submit your feedback on the final design concept for Digman Reserve play space between 8 December and 5 January 2022